Offre économiquement la plus avantageuse selon les critères de l'appel d'offres.
- Construction and installation
- NPK 113 Site establishment
- NPK 116 Felling and site clearance
- +7
Chemins de Chamblandes, de Champittet et du Manoir
- Location
- Canton VD
- Requesting office
- Municipalité de Pully
Awarded
Awarded to
- FFA SA, Villars-Ste-CroixCHF 3’500’349.70
What is being procured?
Scope of work
Renouvellement des conduites industrielles et réaménagements routiers.
Quantités principales
Fouilles : 13'280 m3
Blindage : 3'500 m2
Conduite d'assainissement : 1'635 m1
Conduite d'eau potable en fonte : 865 m1
Conduite Gaz Lausanne : 435 m1
Conduite électrique : 4'790 m1
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 113 – Site establishment
- NPK 116 – Felling and site clearance
- NPK 117 – Demolition and dismantling
- NPK 151 – Construction works for utility mains
- NPK 183 – Fences and site entrances
- NPK 211 – Excavation and earthworks
- NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
- NPK 223 – Asphalt and concrete pavements
- NPK 237 – Drainage and sewer systems
- CPV
- CPV 45222000 – Construction work for engineering works except bridges, tunnels, shafts and subways
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 5810
- Publication number
- 5810-02
- Covered by international agreements
- No
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.