  • Construction and installation

MP-071017 N2 EP04 Airolo-Quinto, CUPRA - Lot 401 Travaux d'entrepreneur

Published in Italian. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton TI
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 27.02.20253 bids

    • Mancini & Marti SA, CastioneCHF 8’983’814.40 incl. VAT
Awards of this contracting authority

Justification

L’offerta del Consorzio CUMA è la più vantaggiosa in quanto ha ottenuto un buon punteggio nei criteri: “CA1 Prezzo” e “CA5 Qualità dell’offerente” grazie alla messa a disposizione di personale qualificato e con buona esperienza professionale in oggetti simili svolti in ruoli analoghi.

What is being procured?

Scope of work

Il presente appalto interessa il tracciato autostradale della N2 dal km 98.500 al km 106.350.

L’intervento principale riguarda la realizzazione di una nuova bretella di aggiramento dell’area di servizio di Stalvedro dal km 105.400 al km 106.000 compresi i relativi raccordi all’asse principale.

L’appalto " N2 EP04 Airolo-Quinto - Lotto 401 opere da impresario costruttore” comprende in particolare:

T/U – Tracciato / ambiente

- Realizzazione di un nuovo rilevato autostradale;

- Realizzazione e potenziamento di bauletti porta cavi e canalizzazioni;

- Lavori di pavimentazione;

- Realizzazione di nuovi plinti di fondazione per segnaletica verticale e impianto di videosorveglianza;

- Rimozione, adattamenti e realizzazione di recinzioni;

- Rimozione, adattamenti e realizzazione delle barriere di sicurezza;

- Nuova segnaletica orizzontale.

K – Manufatti

- Sostituzione giunti di transizione, della impermeabilizzazione e del MA al Ponte Sort;

- Allargamento del sottopasso Stalvedro;

- Realizzazione nuovo sottopasso Stalvedro area di sosta;

- Realizzazione nuovi muri di sostegno bretella di aggiramento area di sosta.

Quantità principali previste:

- Movimenti di terra, scavi e riempimenti: ca. 15'000 m3;

- Calcestruzzo gettato in opera: ca. 1'500 m3;

- Acciaio d’armatura: ca. 25 t;

- Tubi per tracciati cavi: ca. 1’600 m;

- Tubi per canalizzazioni: ca. 500 m;

- Pavimentazione bituminosa: ca. 4’300 t;

- Recinzioni: ca. 1’000 m;

- Bordure (pietra e asfalto): ca. 900 m.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • OAG 2.1 – Road and pathway
  • OAG 3.2 – Retaining structure
  • OAG 3.3 – Cut-and-cover and underground works
CPV
  • CPV 45200000 – Works for complete or part construction and civil engineering work
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
5171
Publication number
5171-02
Covered by international agreements
Yes

Checked against simap: 11.11.2026, 08:08

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Ticino: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.