All tenders
Open · 5 days left
  • Construction and installation
  • NPK 111 Daywork
  • NPK 112 Testing and inspection
  • +9

Flood protection Village Alpthal - Preliminary measures

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
Bezirk Schwyz - Abteilung Umwelt
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
16.11.2026, 16:005 days left
Type
Construction and installation
Procedure
Open procedure
Site visit
Not stated

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Tight deadlineImportant

    5 days left to submit. Plan documents, proofs and delivery now.

    From «Submission deadline»

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • References requiredNote

    For eligibility you need comparable reference projects. Check number, age and size.

    Firmenreferenzen (Unternehmung / ARGE) Es sind zwei Referenzen (Angaben im Formular «Referenznachweis Unternehmung / ARGE») beizubringen. From «Eligibility criteria»

2 more notes
  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

  • Price counts 50 %Good to know

    Price makes up 50 % of the evaluation.

    From «Award criteria»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Die Ausführung des Hochwasserschutzprojekts wird in zwei separaten Losen erstellt.

- Los Vormassnahmen

- Los Hauptarbeiten

Die vorliegende Ausschreibung umfasst die Arbeiten vom Los Vormassnahmen. Das Los Hauptarbeiten ist nicht Bestandteil dieser Ausschreibung.

Die Arbeiten beim Los Vormassnahmen umfassen folgende Massnahmen:

Geissbergbach

Oberhalb der Hochweidstrasse wird ein neuer Geschiebesammler erstellt. Der Einlaufbereich wird mit Blöcken in Beton ausgeführt. Als Auslaufbauwerk wird eine Betonmauer mit eingesetzten Stahlträgern (Rechen) erstellt. Der Unterhaltszugang zum Geschiebesammler erfolgt ab der Hochweidstrasse über eine neue Erschliessungsstrasse mit Schotterrasen. Der best. Durchlass Hochweidstrasse bleibt unverändert.

Oberhalb des Kiessammlers wird das Gerinne mittels einer neu erstellten Beckenstruktur mit Schwellen, bestehend aus 1.5 bis 2.5 Tonnen schweren Blöcken in Beton, auf den nötigen HW-Querschnitt ausgebaut. Die Blöcke in den Böschungen werden nicht einbetoniert. Weiter oben, ausgangs des Waldes, wird mittels Terrainanpassung ein Ablenkdamm erstellt.

Hochweidbach

Oberhalb der Hochweidstrasse wird das Gerinne ausgebaut und der Abflussquerschnitt vergrössert, um das Wasser fassen zu können. Im steilen oberen Bereich wird der Bach durch Blöcke und Schwellen als Beckenstruktur gestaltet.

Mattlibach

Im Oberlauf des Mattlibachs wird ein Geschiebesammler mit einem neuen Auslaufbauwerk erstellt. Der Einlaufbereich wird mit Blöcken in Beton ausgeführt. Das Auslaufbauwerk wird mittels Rechenkosruktion ausgebildet und schliesst an die bestehende Eindolung an.

Karlismattbach

Oberhalb des Siedlungsrandes am Haggeneggweg wird ein neuer Geschiebesammler erstellt. Der Einlaufbereich wird mit Blöcken in Beton ausgeführt. Als Auslaufbauwerk wird eine Betonmauer mit eingesetzten Stahlträgern (Rechen) erstellt. Für den Bau sind vorgängig Umlegungen von Werk- und Quellwasserleitungen erforderlich.

Der Unterhaltszugang zum Geschiebesammler erfolgt über eine neue Erschliessungsstrasse mit Schotterrasen.

Unterhalb des Kiessammlers wird das Gerinne mittels einer neu erstellten Beckenstruktur mit Schwellen, bestehend aus 1.5 bis 2.5 Tonnen schweren Blöcken in Beton, auf den nötigen HW-Querschnitt ausgebaut. Die Blöcke in den Böschungen werden nicht einbetoniert.

Der kleine, bereits vorhandene Kiessammler bleibt unverändert bestehen.

Die detaillierten Massnahmen und genauen Abgrenzungen sind in den Projektpläne ersichtlich.

Die einzelnen Baustellen sind auf verschiedene Teilperimeter verteilt und nicht zusammenhängend. Die Zwischentransporte von Aushubmaterial und Humus sind teilweise Bauplatzübergreifend, wobei die öffentlichen Strassen und Grundstücke/Strassen Dritter gequert werden müssen.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • NPK 111 – Daywork
  • NPK 112 – Testing and inspection
  • NPK 113 – Site establishment
  • NPK 116 – Felling and site clearance
  • NPK 117 – Demolition and dismantling
  • NPK 151 – Construction works for utility mains
  • NPK 211 – Excavation and earthworks
  • NPK 213 – Hydraulic engineering
  • NPK 221 – Sub-bases for transport routes
  • NPK 237 – Drainage and sewer systems
  • NPK 241 – In-situ concrete construction
  • OAG 4.6.1 – Watercourse channel/bank improvement
CPV
  • CPV 45000000 – Construction workCPV general: general code without a field
  • CPV 45240000 – Construction work for water projects
Options
Not provided for
Variants
Admitted

Der Auftrageber behält sich vor, auf eingereichte Varianten ohne weitere Begründung nicht einzutreten, respektive diese nicht zu berücksichtigen.

Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
16.10.2026
Questions untilpast
23.10.2026

Fragen zur Ausschreibung sind schriftlich nur über das entsprechende Simap Forum bis spätestens Freitag 23. Oktober 2026 zu stellen. Die Antworten werden im gleichen Forum bis spätestens Mittwoch 28. Oktober 2026 veröffentlicht. Auf anderen Wegen eingegangene Fragen werden nicht beantwortet.

Submission deadlinenext
16.11.2026, 16:00
Opening of bids
17.11.2026, 11:00, 6430 Schwyz, public

Bezirk Schwyz
Abteilung Umwelt (2. Stock)

Strehlgasse 15

6430 Schwyz

Bid valid
until 16.05.2027
Contract
01.01.2027 to 31.12.2027

Special deadlines and formal requirements

Das Angebot muss spätestens zum Eingabezeitpunkt (Datum Uhrzeit) physisch beim Bezirk Schwyz eingetroffen sein. Bei Angeboten, die per Post eingereicht werden, trägt der Absender das Risiko, dass das Angebot fristgerecht beim Bezirk Schwyz eintrifft.

Submission & documents

According to the simap data. We submit nothing for you.

  • By post or delivery in person

    Bezirk Schwyz - Abteilung UmweltErnst RothPostfach 606431 Schwyz

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

2 eligibility criteria
  1. EK 1

    Eigenleistung

    Die Eigenleistung der Unternehmung resp. ARGE muss in Franken mindestens 60 % der Offertsumme betragen. Die Unternehmung resp. ARGE hat anzugeben, welche NPK Kapitel oder Teile davon sie als Eigenleistung erbringt (Nachweis auf «Formular Eigenleistung»).

  2. EK 2

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Firmenreferenzen (Unternehmung / ARGE)

    Evidence

    Es sind zwei Referenzen (Angaben im Formular «Referenznachweis Unternehmung / ARGE») beizubringen.

    Die Referenzen weisen nach, dass die Unternehmung resp. ARGE innerhalb der letzten acht Jahre (Bauende 2018 oder später) mit der vorliegenden Aufgabe vergleichbare Projekt realisiert hat.

    Die Vergleichbarkeit des Referenzprojektes für die Firmenreferenz beinhaltet:

    1. Wasserbauprojekt mit Bausumme mind. CHF 0.5 Mio. exkl. MWST

    2. Bau eines Geschiebesammlers mit Sperren/Rechen und Rückhaltevolumen >100m³

    Die Referenzen müssen vom federführenden Anbieter oder einem ARGE-Mitglied erbracht werden.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK 1 - Preis

    50 %max. 50 pointsPrice criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Die günstigste bereinigte Offertsumme erhält 50 Punkte. Die Offertsummen die 50% oder mehr vom tiefsten Angebot abweichen, erhalten 0 Punkte. Dazwischen werden die Punkte linear vergeben.

  2. ZK 2 - Qualität / Referenzen

    30 %max. 30 points

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Gewertet werden die Referenzen der Unternehmung/ARGE. Die minimalen Anforderungen sind im Kapitel 2.4.1 Eignungskriterien definiert. Zusätzliche Punkte ergeben die Grösse der Baustellen (Bausumme, Volumen Geschiebesammler), der Nachweis von umfangreichen Blocksatz- und Erdarbeiten / Dammschüttungen im Wasserbauprojekt und die technischen Anforderungen der genannten Baustellen, beispielsweise die technischen Schwierigkeiten bei der Ausführung der Sperren/Rechen, die Anforderungen an die Wasserhaltung oder dgl.

    Die Auswertung erfolgt anhand der ausgefüllten Formulare «Referenznachweis Unternehmung/ARGE».

    Für die Bewertung der Referenzen werden nur die Angaben auf diesen Formularen berücksichtigt. Die Formulare müssen vollständig ausgefüllt werden. Unvollständige Angaben werden nicht berücksichtigt resp. ergeben Abzüge in der Bewertung.

    Für das ZK 2 werden maximal 30 Punkte verteilt.

  3. ZK 3 - Technischer Bericht

    20 %max. 20 points

    Unter diesem Zuschlagskriterium werden die zusätzlich verlangten Unterlagen zum technischen Bericht gemäss Kapitel 2.9 (Besond. Bestimmungen) und alle anderweitigen Angaben des Unternehmers zum Angebot ausgewertet.

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

4 conditions
Bidding consortia
Allowed

Mehrere Anbieter können als Arbeitsgemeinschaft ein gemeinsames Angebot einreichen. Es werden nur Arbeitsgemeinschaften gemäss Art. 28 SIA 118 akzeptiert. ARGE-Partner dürfen sich nur in einer Bietergemeinschaft beteiligen.

Subcontractors
Allowed

Der Unternehmer wird ausdrücklich darauf aufmerksam gemacht, dass die Subunternehmer zum Zeitpunkt des Arbeitsbeginns definitiv bestimmt und bezeichnet sein müssen. Der Unternehmer muss den Bauablauf mit den Subunternehmern so koordinieren, dass ein reibungsloser Ablauf möglich ist.
Spezialisten und/oder Subunternehmer, welche nicht ARGE-Partner sind, dürfen sich mit mehreren Bietergemeinschaften bewerben

Contract extension
Possible
Dialogue
Not provided for

Documents to submit

Only evidence that the publication itself names. This evidence belongs in the bid. The tender documents may ask for more.

1 piece of evidence according to the publication
  • Suitability · EK 2

    Es sind zwei Referenzen (Angaben im Formular «Referenznachweis Unternehmung / ARGE») beizubringen.

    Die Referenzen weisen nach, dass die Unternehmung resp. ARGE innerhalb der letzten acht Jahre (Bauende 2018 oder später) mit der vorliegenden Aufgabe vergleichbare Projekt realisiert hat.

    Die Vergleichbarkeit des Referenzprojektes für die Firmenreferenz beinhaltet:

    1. Wasserbauprojekt mit Bausumme mind. CHF 0.5 Mio. exkl. MWST

    2. Bau eines Geschiebesammlers mit Sperren/Rechen und Rückhaltevolumen >100m³

    Die Referenzen müssen vom federführenden Anbieter oder einem ARGE-Mitglied erbracht werden.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
45929
Publication number
45929-01
Covered by international agreements
No
Notice of legal remedies
Show

Gegen die Ausschreibung kann innert 20 Tagen seit der Publikation auf www.simap.ch beim Verwaltungsgericht des Kantons Schwyz, Postfach 2266, 6431 Schwyz, schriftlich und begründet Beschwerde eingereicht werden (Art. 52 ff. IVöB). Es gelten keine Gerichtsferien.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Schwyz: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.