All tenders
Awarded
  • Construction and installation
  • BKP 230 Transitional item

ETH Zürich, CHN. Kältezentrale+Kühlturm, 230 Elektroinstallationen

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton ZH
Procuring office
ETH Zürich - Real Estate Management
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 14.04.20264 bids

    • Baumann Koelliker AG, ZürichCHF 863’993.30 incl. VAT
Awards of this contracting authority

Justification

Ausschlaggebend für den Zuschlag an die Baumann Koelliker AG war die beste Erfüllung des Zuschlagkriterium Z2 Referenzen, Ausbildung und Erfahrung der Schlüsselpersonen. Insgesamt stellt es das vorteilhafteste Angebot dar.

What is being procured?

Scope of work

Die aus dem Jahr 2001 stammende Kältezentrale im Gebäude CHN soll erneuert und erweitert werden. Die neue Kältezentrale wird an den geplanten Kältering angeschlossen, welche das gesamte ETH Zentrum mit Kälteenergie versorgt. Es werden drei neue NH3-Kältemaschinen erstellt (tot. 4.3 MW Kälteleistung), mit der Möglichkeit zum Ausbau mit einer vierten Maschine. Die Abwärme wird über einen Kühlturm und drei Hybridrückkühler abgeführt.

Es sind die Elektroinstallationen für die Kältemaschinen, Rückkühlung und Anlagen der Gebäudetechnik (HLKS/GA) zu erstellen. Sämtliche Arbeiten finden im laufenden Betrieb statt. Die Elektroinstallationen müssen auf die neue Situation angepasst, erweitert und grösstenteils neu verkabelt werden.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Execution
Trades
  • BKP 230 – Transitional item
CPV
  • CPV 45311000 – Electrical wiring and fitting work
  • CPV 45311200 – Electrical fitting work
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
33527
Publication number
33527-02
Covered by international agreements
No

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Zurich: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.