Begründung: Wirtschaftlichstes Angebot und höchste Punktzahl bei den Zuschlagskriterien.
- Construction and installation
- NPK 111 Daywork
- NPK 112 Testing and inspection
- +5
HWS Splügen, Etappe 1 - 2025 / 2026
- Location
- Canton GR
- Procuring office
- Gemeinde Rheinwald
Awarded
Awarded to
- Zindel + Co. AG, MaienfeldCHF 1’033’411.80
What is being procured?
Scope of work
Etappe 1 - 2025 / 2026:
Die Hochwasserschutzmassnahmen sehen vor, die bestehenden Verbauungen entlang des Hinterrheins instandzusetzen und das orografisch linke Ufer mit einem Längsdamm zu erhöhen. Dadurch wird der Hinterrhein daran gehindert, zukünftig über seine Ufer zu treten.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 111 – Daywork
- NPK 112 – Testing and inspection
- NPK 113 – Site establishment
- NPK 213 – Hydraulic engineering
- NPK 223 – Asphalt and concrete pavements
- NPK 237 – Drainage and sewer systems
- NPK 241 – In-situ concrete construction
- OAG 4.6 – Protective structure
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- CPV 45247210 – Dam construction work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 12905
- Publication number
- 12905-02
- Covered by international agreements
- No