Awarded
- Service
RC20 route d'Hermance - Tronçon Thonon/Sous-Caran - Réaménagement de la chaussée et reconstruction des collecteurs EU-EP
- Location
- Canton GE
- Procuring office
- OCGC - DPC - Service des Routes
Awarded
Awarded to
- Solfor SA, Plan-les-OuatesCHF 403’320.00
What is being procured?
Scope of work
Prestation d'ingénierie civile avec sous-traitance des prestations d'architecte-paysagiste, ingénieur en mobilité et ingénieur géomètre, pour la phase SIA 32 partielle et les phases SIA 41 à 53 du projet de réaménagement de la route d'Hermance entre la route de Thonon et le chemin de Botterel et de la reconstruction des collecteurs EU-EP de la route d'Hermance entre la route de Thonon et le chemin de Sous-Caran.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Service
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 71240000 – Architectural, engineering and planning services
- CPC
- CPC 3d347dc3-c815-4ec1-8e39-637046ba6f27 – Architectural services; engineering services and integrated engineering services, urban planning and landscape architectural services; related scientific and technical consulting services; technical testing and analysis services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 14755
- Publication number
- 14755-02
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.