Awarded
- Construction and installation
- BKP 281.6 Floor tiling
HUG - Beau-Séjour 26 CFC 281 Carrelage
- Location
- Place open, contracting authority in canton GE
- Procuring office
- Centrale d'achats et d'ingénierie biomédicale Vaud-Genève (CAIB)
Awarded
Awarded to
- Di Chiara SA, MeyrinCHF 192’504.09
What is being procured?
Scope of work
Le bâtiment Beau-Se jour (0A), construit dans les années 1960, fera l’objet d’une re novation de façade dans le cadre du projet « Embrasures », ainsi que d’une modernisation partielle de ses installations techniques. Ces travaux visent a améliorer le confort des patients tout en assurant la conformité aux exigences du standard « HPE rénovation » fixe par les autorités.
Le marche concerne les prestations de carrelage dans les nouvelles salles de bain. Environ 40 salles de bain seront créées sur trois étages du bâtiment Beau-Séjour et devront être carrelées.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 281.6 – Floor tiling
- OAG 1.6.3 – Hospital
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 14419
- Publication number
- 14419-03