Offre jugée la plus avantageuse
- Construction and installation
- BKP 272.0 Internal metal doors
- BKP 272.1 Prefabricated metal components
- +4
Champ-Dollon / Metal structures
- Location
- Canton GE
- Requesting office
- Etat de Genève - Département du Territoire (DT)
Awarded
Awarded to
- Joux S.A., Mont-sur-LausanneCHF 1’184’452.78
What is being procured?
Scope of work
Le marché concerne tous types de travaux de serrurerie sur le site carcéral de Champ-Dollon comprenant :
- portes et fenêtres
- tablettes et grilles de fenêtre
- filets anti-volatiles
- clôtures et portails extérieurs
- petits travaux de serrurerie
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 272.0 – Internal metal doors
- BKP 272.1 – Prefabricated metal components
- BKP 272.2 – General metalwork
- BKP 272.3 – Internal glazing
- BKP 413.3 – Prefabricated steel construction
- BKP 416 – Fit-out 2
- OAG 1.3.7 – Office and administrative building
- OAG 1.5.2 – Penal institution
- CPV
- CPV 45421100 – Installation of doors and windows and related components
- CPV 45223110 – Installation of metal structures
- CPV 45340000 – Fencing, railing and safety equipment installation work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 31992
- Publication number
- 31992-02
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.