- Construction and installation
- NPK 111 Daywork
- NPK 112 Testing and inspection
- +8
Châtillon (JU) - Village crossing (1st stage)
- Procuring office
- sd ingénierie jura sa
- Requesting office
- Commune de Châtillon (sdplus)
At a glance
- 03.12.2026, 00:0022 days left
- Construction and installation
- Open procedure
- In the documents
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Deadline at 00:00Note
The deadline is published with 00:00, the start of that day. Check the original tender for how it is meant.
Bid languageNote
The bid must be in French.
No bidding consortiumNote
A joint bid with other companies is not allowed.
2 more notes
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
Travaux de réfection de la traversée du village de Châtillon, étape 1 (travaux 2027).
Le présent projet a pour objectif la réfection des rues concernées.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 111 – Daywork
- NPK 112 – Testing and inspection
- NPK 113 – Site establishment
- NPK 117 – Demolition and dismantling
- NPK 151 – Construction works for utility mains
- NPK 211 – Excavation and earthworks
- NPK 221 – Sub-bases for transport routes
- NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
- NPK 223 – Asphalt and concrete pavements
- NPK 237 – Drainage and sewer systems
- CPV
- CPV 45200000 – Works for complete or part construction and civil engineering work
- Options
- Not provided for
- Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 05.11.2026
- Express interest beforenext
- 17.11.2026
- Documents available
- 05.11.2026 to 03.12.2026
- Questions until
- 19.11.2026
- Submission deadline
- 03.12.2026, 00:00
- Bid valid
- 270 days after the deadline
- Execution
- 01.03.2027 to 27.11.2027
Site visit
Selon chapitre 4.3 des directives administratives.
Submission & documents
By post or delivery in person
Commune de Châtillon (JU) (sdplus)Route de Courrendlin 32843 ChâtillonSource: simap data
- Documents on simap.ch (after signing in)
- French
- French
Les offres et leurs annexes dans une autre langue seront retournées à l'entreprise sans être examinées.
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Participation & suitability
Selon chapitre 5 des directives administratives.
Award criteria
Selon chapitre 6 des directives administratives.
Conditions
5 conditions
- Bidding consortia
- Not allowed
Selon chapitre 2.3 des directives administratives.
- Subcontractors
- Allowed
Selon chapitre 2.6 des directives administratives.
- Contract extension
- Not provided for
- Dialogue
- Not provided for
- Further information on the conditions
Selon chapitre 3 des directives administratives.
Official source
- simap project number
- 46789
- Publication number
- 46789-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
Le présent appel d’offres peut faire l’objet d’un recours à la Cour administrative du Tribunal cantonal, 9, chemin du Château, 2900 Porrentruy, dans un délai de vingt jours à compter de sa publication. La procédure d’opposition est exclue. Le recours n’a pas d’effet suspensif. Le Président de la Cour administrative peut accorder, sur demande, l’effet suspensif au recours. Le mémoire de recours doit en tous les cas contenir un exposé concis des faits, des motifs et moyens de preuve, ainsi que l'énoncé des conclusions. La décision attaquée et les documents servant de moyens de preuve en possession du recourant doivent être joints au mémoire. Le recours doit être daté et signé par le recourant ou son mandataire (art. 127 Cpa). Le non-respect de ces exigences formelles peut notamment entraîner l’irrecevabilité du recours.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.