Awarded
- Construction and installation
- BKP 293 Electrical engineer
- eBKP-H D01.05 Power-using equipment: luminaires
LED Generalersatz Beleuchtung
- Location
- Canton SZ
- Procuring office
- Hochbauamt Kanton Schwyz
Awarded
Awarded to
- R. Mettler AG, IbachCHF 412’671.75
What is being procured?
Scope of work
Elektroingenieurleistungen SIA 108, LED Ersatz (SIA-Phase 31-53).
Die wesentlichen Leistungen umfassen:
- Planung/ Realisierung von Beleuchtungsersatz durch LED in Büro- und Verwaltungsbauten
- Gesamtleitung
- Evaluation der Bestvariante pro Standort
- Erarbeiten und Beantragen der Förderbeitrage
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Design and execution
- Procedure
- Open procedure
- Trades
- BKP 293 – Electrical engineer
- eBKP-H D01.05 – Power-using equipment: luminaires
- OAG 1.2.4 – University and university of applied sciences
- OAG 1.3.7 – Office and administrative building
- CPV
- CPV 45220000 – Engineering works and construction works
- CPV 45210000 – Building construction work
- CPV 45310000 – Electrical installation work
- CPV 71300000 – Engineering services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 969
- Publication number
- 969-02
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.