Awarded
- Construction and installation
- BKP 3 Special equipment and services
- BKP 4 External works
- +7
Spiel- und Pausenplätze; Konzept Umsetzung; Spielplatz Tüchelweiher
- Location
- Canton SG
- Procuring office
- Stadt Rapperswil-Jona; Bau, Liegenschaften
Awarded
Awarded to
- Egli Jona AG, JonaCHF 175’000.00
What is being procured?
Scope of work
Rückbau und Abbruch vorhandene Spielplatzanlage inkl. Teilrodungen. Abtrag Ober- und Unterboden. Bau werk- und Kanalisationsleitungen. Bau neue Verkehrsflächen und Plätze. Bau Einzelfundamente und Versetzarbeiten. Anlegen Ober- und Unterboden sowie Ansaat und Bepflanzung.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Trades
- BKP 3 – Special equipment and services
- BKP 4 – External works
- NPK 100 – Enabling, special foundation and geotechnical, repair and external works
- NPK 200 – Civil engineering incl. underground works
- eBKP-T L – Enabling works for civil engineering
- eBKP-T M – Ground engineering, special foundation and geotechnical works
- eBKP-T Q – Utility engineering
- eBKP-T R – Traffic routes
- eBKP-T T – Equipment
- OAG 2 – Transport facilities
- OAG 4 – Facilities
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 12763
- Publication number
- 12763-02
- Covered by international agreements
- No
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.