Residential buildings Zelgstrasse 18/20/22, complete renovation and upgrading of residential buildings BKP 211 Master builder work
Machine-translated
Deadline today
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
Bid languageNote
The bid must be in German.
Online via simap onlyGood to know
Bids are submitted on simap.ch; you need a bidder account there.
Das Kantonale Elektrizitätswerk Nidwalden beabsichtigt im Zusammenhang mit dem Neubau des Hauptsitzes, Bauleistungen zu beschaffen.
Die Leistungen umfasst die Betonarbeiten. Die detaillierten Ausmasse ergeben sich aus den Submissionsplänen.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
gemäss Terminprogramm
Online via simap.ch
Source: simap data
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Gegen diese Ausschreibung kann innert 20 Tagen seit der Publikation Beschwerde beim Verwaltungsgericht des Kantons Nidwalden, Bahnhofplatz 3, Postfach 1241, 6371 Stans, erhoben werden. Die Beschwerde muss einen Antrag sowie eine Begründung enthalten.
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.
With Pro, an AI summarises this tender: services, requirements, conditions, dates and award criteria, with key figures, a timeline and the weighting, each with the literal quote from the publication.
Sign in. New companies use Pro for the first 30 days.
3 awards, bids (median): 5. Median award price CHF 1’522’993, middle half CHF 1’474’074 to CHF 1’778’714.
Awards: Main construction worksMachine-translated
Deadline today
Machine-translated
Deadline today
Machine-translated
Deadline today
3 days left