Das wirtschaftlich am vorteilhafteste Angebot unter Berücksichtigung der Zuschlagskriterien der Ausschreibung.
- Construction and installation
- NPK 111 Daywork
- NPK 112 Testing and inspection
- +8
Brunnenstrasse, Oberflächenerneuerung und Aufwertung, Kanal- und Werkleitungsbau
- Location
- Canton ZH
- Procuring office
- Gossweiler Ingenieure AG
- Requesting office
- Stadt Wallisellen, Tiefbau + Landschaft / die werke versorgung wallisellen ag
Awarded
Awarded to
- Opus AG Bauunternehmung, WallisellenCHF 634’250.85
What is being procured?
Scope of work
Umfang des Auftrags gemäss den Ausschreibungsunterlagen
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 111 – Daywork
- NPK 112 – Testing and inspection
- NPK 113 – Site establishment
- NPK 117 – Demolition and dismantling
- NPK 151 – Construction works for utility mains
- NPK 211 – Excavation and earthworks
- NPK 221 – Sub-bases for transport routes
- NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
- NPK 223 – Asphalt and concrete pavements
- NPK 237 – Drainage and sewer systems
- OAG 2.1 – Road and pathway
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 22325
- Publication number
- 22325-02
- Covered by international agreements
- No
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.