- Construction and installation
Running track superstructure overhaul Martigny – Martigny Bourg [Km1+059 to Km2+806] over 1694m Simplon Bridge [Km0+599 to Km0+870] over 270m
- Procuring office
- Achats - TMR SA
- Requesting office
- TMR – Transports de Martigny & Régions SA, Infrastructure
At a glance
- 23.11.2026, 10:0012 days left
- Construction and installation
- Open procedure
- In the documents
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in French.
Subcontracting limitedGood to know
The publication limits subcontracting, for example by share or by requiring consent.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
What is being procured?
Scope of work
Ligne à voie normale entre les gares de Martigny et Martigny Bourg : « VN 22.40 Réfection de voie sur le Pont du Simplon (270ml) & VN30.05 Réfection de voie entre Martigny Martigny Bourg (1694ml).
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not provided for
- Variants
- Admitted
Les variantes sont admises mais aux conditions suivantes :
• Les variantes doivent correspondre à l’offre de base en ce qui concerne l’utilisation,
la fiabilité et la sécurité de l’ouvrage projeté.
• Les différentes variantes proposées doivent contenir toutes les données
nécessaires à l’évaluation technique et financière de l’offre.
• Si une variante d’entreprise requiert des indications autres que celles mentionnées
dans les documents, l’entrepreneur doit l’indiquer dans son offre et prendre en
compte les éventuelles circonstances ayant un impact sur le coût dans son offre
tarifaire.
• Les descriptifs des variantes doivent être établis avec le CAN.
• Si, après coup, la variante d’entreprise se révèle incomplète, non équivalente voire
insuffisante en tout point malgré le soin apporté au contrôle, l’entrepreneur assume
la responsabilité totale de l’étude de projet, du contrôle et de l’exécution.
L’entrepreneur est par ailleurs dans l’obligation d’instruire et d’attirer l’attention de
la direction des travaux concernant les détails et mesures à prendre en
considération pour la variante d’entreprise.
• Les autorisations nécessaires pour les variantes d’entreprise doivent être fournies
à la charge de l’entrepreneur.
L’offre de base doit également être remise. - Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 22.09.2026
- Documents available
- 22.09.2026 to 23.11.2026
- Questions untilpast
- 12.10.2026
Les questions relatives à l’appel d’offres doivent être adressées sur la plateforme SIMAP
avant la date indiquée.Aucun renseignement ne sera communiqué par téléphone ou mail, seul la plateforme SIMAP
sera utilisée. - Submission deadlinenext
- 23.11.2026, 10:00
- Opening of bidsnext
- 23.11.2026, 14:00, 1920 Martigny, not public
Aucune ouverture publique des offres n’est prévue.
- Execution
- 28.06.2027 to 03.08.2027
Les prestations de meulage et de bourrage programmées 6 à 12mois après la réfection devront être
réalisées avant le 31/12/2028.
Site visit
Aucune visite n’est prévue.
Special deadlines and formal requirements
Special deadlines and formal requirements
L’offre doit impérativement être envoyée sous pli fermé et devra être en main du maître de
l’ouvrage en date du 23.11.2026 – 10h00 (Attention, le cachet postal ne fait pas foi). Le
courrier doit être envoyé de sorte qu'il soit acheminé à la date prévue à l'adresse suivante
:
TMR SA – INFRASTRUCTURE, A l'attention de M. Samuel BIGLER
Avenue de la Gare 66, 1920 Martigny, VS avec la mention : « VN 22.40 Réfection de voie sur
le Pont du Simplon (270ml) & VN30.05 Réfection de voie entre Martigny-Martigny Bourg
(1694ml) ». – NE PAS OUVRIR »
Passé ce délai, l'offre ne pourra pas être prise en considération.
Submission & documents
By post or delivery in person
TMR SA – INFRASTRUCTUREM. Samuel BIGLERAvenue de la Gare 661920 MartignySource: simap data
- Documents on simap.ch (after signing in)
- French
- French
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Conditions
4 conditions
- Bidding consortia
- Allowed
La constitution d'un groupement d'entreprises est acceptée, à condition que chaque
membre du consortium établisse ou garantisse par contrat :
a) Qu’il remplit les critères d'aptitude demandés pour ce projet ;
b) Qu’il respecte les dispositions relatives à la protection des travailleurs et aux
conditions de travail et qu'il est en règle avec le paiement des charges sociales ;
c) Qu’il respecte les conventions collectives respectivement les contrats-types ou,
en leur absence, les prescriptions usuelles de la branche applicables sur le lieu
d'exécution des travaux ;
d) Qu’il respecte le principe de l'égalité entre hommes et femmes ;
e) Qu’il traite de manière confidentielle les informations fournies par les
soumissionnaires.
Les membres d’un consortium forment une société simple et doivent en confier le pilotage
à une entreprise. Ils sont solidairement responsables. La composition du consortium ne doit
pas être modifiée une fois les offres remises, et ce jusqu’à l’adjudication.
Chaque soumissionnaire peut déposer une offre seule ou avec d’autres entreprises au sein
d’une communauté de travail ; la candidature d’une entreprise en tant que membre d’un
consortium dans plus d’une communauté de travail n’est pas autorisée - Subcontractors
- Allowed
La sous-traitance est autorisée. Un sous-traitant ne peut à son tour sous-traiter les travaux.
Les sous-traitants non annoncés lors du dépôt de l'offre doivent être agréés par le maître
de l'ouvrage.
L’entrepreneur prend l’entière responsabilité des sous-traitants éventuels auxquels il aura
confié des travaux qu’il n’exécute pas lui-même. Il en est de même pour la qualité des
produits de ses fournisseurs.
L'entrepreneur garantit par contrat que les sous-traitants éventuels :
a) Remplissent les critères d'aptitude demandés pour ce projet ;
b) Respectent les dispositions relatives à la protection des travailleurs et aux
conditions de travail et sont en règle avec le paiement des charges sociales ;
c) Respectent les conventions collectives, respectivement les contrats-types ou, en
leur absence, les prescriptions usuelles de la branche applicables sur le lieu
d'exécution des travaux ;
d) Respectent le principe de l'égalité entre hommes et femmes ;
e) Traitent de manière confidentielle les informations fournies par les
soumissionnaires.
Le soumissionnaire transmettra obligatoirement dans son offre la liste des sous-traitant en
complétant la pièce D9.
Le cas échéant, la part de sous-traitance ne doit pas dépasser le 30 % de l’ensemble du
marché. - Contract extension
- Not provided for
- Dialogue
- Not provided for
Official source
- simap project number
- 44594
- Publication number
- 44594-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
La présente décision peut faire l'objet d'un recours dans les 20 jours dès sa publication auprès de la Cour de droit public du Tribunal cantonal à Sion.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.