  • BKP 291 Architect
  • BKP 292 Structural/civil engineer

Extension de l’école primaire de Farvagny-le-Grand

Published in French. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton FR
Procuring office
Commune de Gibloux
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 09.04.20258 bids

    • Charly Jolliet Architecte Sàrl, FribourgCHF 35’000.00 without VAT
    • Rank 2 Jean Gérard Giorla et Mona Trautmann, Bureau d'Architectes SA, SierreCHF 27’000.00
    • Rank 3 eido architectes sàrl, Yverdon-les-BainsCHF 20’000.00

    Further ranks as published on simap.ch; sums and key figures count the first rank only.

Awards of this contracting authority

Justification

À l’issue des délibérations, le Jury a classé, parmi 8 projets et à l’unanimité les projets suivants :

1er rang - 1er prix, CHF 35'000.- HT Projet N° 06 Continuum charly jolliet architectes sàrl, Fribourg et Berset Bruggisser sàrl, Fribourg Le Collectif SA, Carouge

2ème rang - 2ème prix, CHF 27'000.- HT Projet N° 01 Dix heures dix Giorla & Trautmann Architectes SA, Sierre Cordonier & Rey SA, Sierre

3ème rang - 3ème prix, CHF 20'000.- HT Projet N° 02 Pourquoi, Pourquoi, Pourquoi ? eido architectes sàrl, Yverdon-les-Bains Jurmann & Cretton SA, Monthey

Le Jury a décidé d’attribuer, aux cinq projets non retenus, une indemnité d'un montant de CHF 10'000.- HT sans distinction de classement.

Le collège d’experts recommande au maître d’ouvrage de poursuivre l’étude et d’attribuer le mandat aux auteurs du projet: N° 06 Continuum. Ses auteurs tiendront compte des souhaits émis par le collège d’experts, tels que décrits dans le rapport du Jury, dans le cadre de l’évolution de leur projet.

What is being procured?

Scope of work

Extension de l'école primaire de Farvagny-le-Grand.

L'étude des besoins scolaires, à l'horizon 2040, nécessite l'agrandissement de l'école primaire de Farvagny-le-Grand. L’école existante contient 16 salles de classe primaire de 1H à 8H, 2 salles d'activités créatrices et 3 salles d'appui. Pour atteindre ces objectifs, l'établissement devra s'adjoindre de 6 salles de classe primaire, 2 salles de classe libre, 2 salles d'activités créatrices et l'agrandissement de l'accueil extrascolaire.

Key facts, codes and options

Type of contract
Not evident from the available publication data.
Type of construction
Building construction
Procedure
Selective procedure
Trades
  • BKP 291 – Architect
  • BKP 292 – Structural/civil engineer
  • OAG 1 – Building
CPV
  • CPV 45214210 – Primary school construction work
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
2973
Publication number
2973-04
Covered by international agreements
Yes

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Fribourg: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.