Le critère de prix ainsi que les références mentionnées ont notamment fait la différence au niveau de la note finale.
- Construction and installation
Sécurisation de la Dranse - Travaux de génie civil pour la zone amont Ville-Étape 1
- Location
- Canton VS
- Procuring office
- Commune de Martigny - Services Techniques
- Requesting office
- Commune de Martigny et Martigny-Combe - Services Techniques
Awarded
Awarded to
- Bitz travaux publics SA, SionCHF 1’696’554.65
What is being procured?
Scope of work
Travaux DRANSE
Terrassement du fond de lit et pieds de digues 30000 m3
Valorisation de matériaux excavés (fond du lit) 20000 m3
Fourniture de blocs de pieds de digues et fond du lit 12000 to
Mise en place blocs pour pieds de digues et fond du lit 22000 to
Fourniture de grave pour filtre 2000 m3
Mur en béton avec parement cyclopéen 350 m2
Jointoyage des enrochements en grave 8000 m3
TRAVAUX CONNEXES
Construction de prise d'eau 1 pc
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Design and execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45200000 – Works for complete or part construction and civil engineering work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 5744
- Publication number
- 5744-02
- Covered by international agreements
- No
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.