All tenders
Awarded
  • Construction and installation

Neuendorf, Dorf- / Härkingerstrasse, Gemeindegrenze Niederbuchsiten bis Gemeindegrenze Härkingen, Sanierung Ortsdurchfahrt mit Instandsetzung / Neubau Kunstbauten

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton SO
Procuring office
Bau- und Justizdepartement des Kantons Solothurn
Requesting office
Amt für Verkehr und Tiefbau
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 26.01.20269 bids

    • KIBAG Bauleistungen AG, OftringenCHF 7’958’895.20 incl. VAT
Awards of this contracting authority

Justification

Die massgebenden Merkmale und Vorteile des berücksichtigten Angebots sind:

- gute bis sehr gute auftragsspezifische Qualifikation (Firmenreferenzprojekte) - vorteilhaftes Preisangebot (Angebotspreis, Plausibilität) - sehr gute Kompetenz (Referenzen, baustellenbezogene Organisation) - sehr gute Qualität (Technischer Bericht, Risikoanalyse) - gutes Bauprogramm daraus: sehr guter Beurteilungspreis

What is being procured?

Scope of work

Amt für Verkehr und Tiefbau

Hauptkubaturen:

- Abbruch Asphaltbelag 21’000 m2

- Aushub fest 15’500 m3

- Betonabbruch 2’000 m3

- Fundationsschicht fest 17’000 m3

- Randabschlüsse versetzen 6’000 m

- Bituminöse Beläge 7’250 to

- Rohre Polypropylen 1’700 m

- Kontrollschächte 21 Stk

- Strassenabläufe und Abläufe 145 Stk

- Betonbauten (Brücken, Mauern, etc.) 400 m3

Einwohnergemeinde Neuendorf

Hauptkubaturen:

- Aushub fest 680 m3

- Rohre Polyethylen 50 m

- Betonfundamente (Bus, Velounterstand) 35 m3

- Kieslieferung fest 640 m3

Elektra Neuendorf

Hauptkubaturen:

- Aushub fest 890 m3

- Rohre Polyethylen 1’290 m

- Schachtabdeckungen Kontrollschächte 35 Stk

- Kieslieferung fest 780 m3

Zweckverband ARA GÄU

Hauptkubaturen:

- Schachtabdeckungen Kontrollschächte 51 Stk

Swisscom Schweiz AG

Hauptkubaturen:

- Aushub fest 280 m3

- Rohre Polyethylen 910 m

- Schachtabdeckungen Kontrollschächte 2 Stk

- Kieslieferung fest 200 m3

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 45000000 – Construction workCPV general: general code without a field
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
24828
Publication number
24828-02
Covered by international agreements
No

Checked against simap: 11.11.2026, 08:08

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Solothurn: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.