  • Construction and installation

150 kV line Fuhren - Innertkirchen // 150 kV line Hopflauenen - Innertkirchen

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
Kraftwerke Oberhasli AG
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
01.12.2026, 23:5920 days left
Type
Construction and installation
Procedure
Open procedure
Award weighting
In the documents
Eligibility
In the documents

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Mandatory site visit: check the dateImportant

    According to the publication, attending is mandatory; date and place are in the note. Check there whether the visit is still ahead: missing it risks exclusion.

    Es findet eine obligatorische Begehung statt. From «Site visit»

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • No bidding consortiumNote

    A joint bid with other companies is not allowed.

    From «Bidding consortia»

1 more note
  • Online via simap onlyGood to know

    Bids are submitted on simap.ch; you need a bidder account there.

    From «Submission»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Die Kraftwerke Oberhasli AG (KWO) betreiben im Gadmental die beiden Kraftwerke Fuhren und Hopflauenen. Die Energieableitung erfolgt über eine 150 kV Freileitung.

Altershalber wird die bestehende 150 kV Freileitung Fuhren–Innertkirchen (M1-M26) umfassend saniert und instand gestellt. Parallel dazu erfolgt die Sanierung der 150 kV Freileitung Hopflauenen–Innertkirchen (M16a-M26). Beide Leitungen verlaufen im Abschnitt zwischen Mast 17 und Mast 26 auf gemeinsamen Tragwerken, weshalb die Massnahmen koordiniert umgesetzt werden.

Bei sämtlichen vorgesehenen Arbeiten handelt es sich um Instandhaltungs- und Sanierungsmassnahmen mit lediglich geringfügigen technischen Änderungen. Das für die Sanierung erforderliche Leitungsbaumaterial (ausgenommen Korrosionsschutz Farbe – und Material) wird bauseits bereitgestellt.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Design and execution
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 45259000 – Repair and maintenance of plant
  • CPV 31321000 – Electricity power lines
  • CPV 45232210 – Overhead line construction
  • CPV 45315400 – High voltage installation work
Options
Not provided for
Variants
Admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
22.09.2026
Documents available
22.09.2026 to 31.12.2026
Questions untilpast
27.10.2026
Submission deadlinenext
01.12.2026, 23:59
Bid valid
90 days after the deadline

Site visit

Mandatory according to the publication
Note of the contracting authority (date, time and place as published)

Es findet eine obligatorische Begehung statt.
Die Anbieter haben sich bis spätestens am 9. Oktober 2026, 16:00 Uhr schriftlich bei der Projektleitung für die Begehung anzumelden

Submission & documents

According to the simap data. We submit nothing for you.

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Note on obtaining the documents

Die kompletten Unterlagen (Pläne) können via KWO iDrop werden. Die Logindaten werden an empfangsberechtigte Unternehmer zugestellt. Die Logindaten sind per E-Mail bei der unter Ziff. 4.1 genannten Ansprechperson zu beantragen.

Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

4 conditions
Bidding consortia
Not allowed
Subcontractors
Allowed
Contract extension
Not provided for
Dialogue
Not provided for

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
39965
Publication number
39965-04
Covered by international agreements
No
Notice of legal remedies
Show

Gegen die Ausschreibung kann innert 20 Tagen seit Veröffentlichung bei der Wirtschafts-, Energie- und Umweltdirektion des Kantons Bern (WEU), Münsterplatz 3a, Postfach, 3000 Bern 8, schriftlich Beschwerde erhoben werden. Die Beschwerde ist im Doppel einzureichen und hat einen Antrag, die Angabe von Tatsachen und Beweismitteln, eine Begründung sowie die Unterschrift der beschwerdeführenden Person oder ihrer Vertretung zu enthalten. Die angefochtene Ausschreibung und greif-bare Beweismittel sind beizulegen.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Bern: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.