Open · 37 days leftCorrected
  • Construction and installation

MP-120093, N2 Belchen Tunnel Second Renovation (BZI) / Lot 102 Construction Tube BAS

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Go to the official tender(simap.ch, opens in a new tab)

Corrected publication

Changed according to simap: Question rounds

Remark of the contracting authority

Es findet eine 2te fragerunde statt - bitte beachten Sie diesbezüglich die Termine.

First published on 25.08.2026. The current version on simap.ch is authoritative.

At a glance

Deadline
18.12.2026, 23:5937 days left
Place
Cantons BL, SO
Type
Construction and installation
Procedure
Open procedure
Site visit
Not mandatory

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • References requiredNote

    For eligibility you need comparable reference projects. Check number, age and size.

    FIRMENERFAHRUNG/-REFERENZ Eine vergleichbare Referenz: Bei der Beurteilung der Eignung wird eine Referenz als vergleichbar anerkannt, wenn sie mindestens folgende Bedingungen erfüllt: a) Art der … From «Eligibility criteria»

  • Price counts 70 %Note

    Price makes up 70 % of the evaluation.

    From «Award criteria»

4 more notes
  • Publication correctedNote

    The contracting authority changed details. The current version applies.

    From «Correction»

  • Securities per contractGood to know

    Whether a surety or guarantee is needed is set out in the contract or the documents. Check there.

    Gemäss Ziffer 5 der vorgesehenen Vertragsurkunde. From «Securities and guarantees»

  • Subcontracting limitedGood to know

    The publication limits subcontracting, for example by share or by requiring consent.

    Subunternehmer können zu max. 50 % beigezogen werden. From «Subcontractors»

  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Language of the publication

Das Los 102 umfasst die Erneuerung der Tunnelröhre Basel (BAS). Dazu gehören umfassende Tiefbauarbeiten, der Neubau der Zwischendecke und des Sohlgewölbes, der Umbau der Tunnelzentralen sowie diverse Instandsetzungsmassnahmen am Bestand.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • OAG 3.3 – Cut-and-cover and underground works
CPV
  • CPV 45000000 – Construction workCPV general: general code without a field
Options
Not provided for
Variants
Admitted

Einzig technische Varianten sind zulässig. Pauschal- und Globalangebote und/oder Angebote mit Zeitmitteltarif werden ausgeschlossen. Die Amtsvariante ist in jedem Falle vollständig einzureichen.

Partial offers
Not admitted

Die Angebote sind vollständig ausgefüllt einzureichen. Abänderungen am Angebotstext sind nicht zulässig. Teilangebote sind ungültig und scheiden aus der Bewerbung aus.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
29.09.2026 (first published 25.08.2026)
Documents available
25.08.2026 to 18.12.2026
Questions until (round 1)past
18.09.2026

Fragen sind in deutscher Sprache unter www.simap.ch im «Forum» einzureichen. Sie werden bis am 02.10.2026 allen Bezügern der Ausschreibungsunterlagen gleichlautend unter www.simap.ch im «Forum» beantwortet. Nach dem 18.09.2026 eintreffende Fragen werden nicht mehr beantwortet.

Questions until (round 2)next
13.11.2026

Fragen für die 2te Fragerunde sind in deutscher Sprache unter www.simap.ch im «Forum» einzureichen. Sie werden bis am 27.11.2026 allen Bezügern der Ausschreibungsunterlagen gleichlautend unter www.simap.ch im «Forum» beantwortet. Nach dem 13.11.2026 eintreffende Fragen werden nicht mehr beantwortet.

Submission deadline
18.12.2026, 23:59
Opening of bids
05.01.2027, not public
Bid valid
300 days after the deadline
Contract
01.07.2027 to 31.12.2032
Execution
01.01.2028 to 31.12.2032

Site visit

Note of the contracting authority (date, time and place as published)

Es findet keine Begehung statt.

Submission & documents

The tender names 2 routes. We submit nothing for you.

  • By post or delivery in person

    Bundesamt für Strassen ASTRA -Abteilung Strasseninfrastruktur-Ost - F3Brühlstrasse 34800 Zofingen

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

  • Special submission route

    Es sind 2 Exemplare des Angebots (der Angebotsunterlagen) in Papierform und 1 in elektronischer Form (USB-Stick) einzureichen.

    Einreichung auf dem Postweg:

    A-Post oder PostPac Priority (Datum Poststempel einer Schweizerischen oder staatlich anerkannten ausländischen Poststelle; Firmenfrankaturen gelten nicht als Poststempel). Die Anbieter bzw. der Anbieter hat in jedem Fall den Beweis für die Rechtzeitigkeit der Angebotseinreichung sicherzustellen. Verspätete Angebote werden nicht mehr berücksichtigt. Auf dem Couvert ist neben der Projektbezeichnung deutlich der Vermerk «Nicht öffnen - Offertunterlagen» anzubringen.

    Persönliche Abgabe:

    Die Abgabe hat bis spätestens am unten erwähnten Abgabetermin während den Öffnungszeiten der Loge (08:00 Uhr - 12:00 Uhr und 13:00 Uhr - 17:00 Uhr (Freitag bis 16:00 Uhr)) gegen Ausstellung einer Empfangsbestätigung zu erfolgen (Adresse s. «Bedarfsstelle»).

    Übergabe an eine diplomatische oder konsularische Vertretung der Schweiz:

    Ausländische Anbieter können ihr Angebot bis spätestens am unten erwähnten Abgabetermin einer diplomatischen oder konsularischen Vertretung der Schweiz in ihrem Land, während den Öffnungszeiten gegen Ausstellung einer Empfangsbestätigung, übergeben.

    Die Anbieter sind in diesem Fall verpflichtet, die Empfangsbestätigung vor dem Abgabetermin per E-Mail der Beschaffungsstelle zu senden.

    Auf Angebote, die per E-Mail oder Fax zugestellt werden, wird nicht eingetreten!

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

5 eligibility criteria
  1. EK1

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    FIRMENERFAHRUNG/-REFERENZ

    Evidence

    Eine vergleichbare Referenz: Bei der Beurteilung der Eignung wird eine Referenz als vergleichbar anerkannt, wenn sie mindestens folgende Bedingungen erfüllt:

    a) Art der Infrastruktur: Autobahn/Nationalstrasse, Kantonsstrasse

    b) Art des Werkes: Instandsetzung eines Tunnels mit einer Ausbruchbreite von mindestens 9 m und einer Länge von mindestens 500 m

    c) Vertragssumme des Referenzprojektes in der Höhe von mindestens CHF 25 Mio. exkl. MwSt

    d) Die Ausführung des Referenzprojektes muss abgeschlossen sein

    Im Fall einer Arbeitsgemeinschaft (ARGE) kann die Referenz auch von einem einzelnen ARGE-Mitglied sein

    Die von einer Firma oder von einem ARGE-Mitglied einer vorhergehenden ARGE dargelegte Referenz ist nur gültig, wenn die gleiche Firma bzw. das einzelne ARGE-Mitglied die in der Ausschreibung verlangten Arbeiten tatsächlich ausgeführt hat.

  2. EK2

    TEXFY assessment: What this means: Obligations – whether your company is registered and complies with taxes, social security contributions and working conditions.

    WIRTSCHAFTLICHE/FINANZIELLE LEISTUNGSFÄHIGKEIT

    Evidence

    Bestätigung, dass der Jahresumsatz des Anbieters für die Jahre 2024 und 2025 mehr als das doppelte des Jahresumsatzes der Angebotssumme (exkl. MwSt.) beträgt.

    Nach Offerteingabe auf Verlangen des Auftraggebers einzureichende Eignungsnachweise/Bestätigungen, allesamt nicht älter als 3 Monate:

    - Handelsregister- und Betreibungsregisterauszug

    - Auszug Ausgleichskasse AHV/IV/EO/ALV

    - Bestätigung UVG-Versicherer

    - Bestätigung Steuerverwaltung

    - Versicherungsnachweise

  3. EK3

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    SCHLÜSSELPERSON/REFERENZ

    Evidence

    Eine vergleichbare Referenz der Schlüsselperson: Als Schlüsselperson gilt die Funktion Baustellenchef/in.

    Bei der Beurteilung der Eignung wird eine Referenz als vergleichbar anerkannt, wenn sie mindestens folgende Bedingungen erfüllt:

    a) Art der Infrastruktur: Autobahn/Nationalstrasse, Kantonsstrasse

    b) Art des Werkes: Instandsetzung eines Tunnels mit einer Ausbruchbreite von mindestens 9 m und einer Länge von mindestens 500 m

    c) Vertragssumme des Referenzprojektes in der Höhe von mindestens CHF 25 Mio. exkl. MwSt

    d) Die Ausführung des Referenzprojektes muss abgeschlossen sein

    e) Die Schlüsselperson hat Deutsch als Muttersprache respektive mind. B2 als Sprachkompetenz gemäss gemeinsamem europäischen Referenzrahmen für Sprachen (CEFR) nachzuweisen. Der Bauherr behält sich vor, die sprachlichen Kompetenzen der Kandidaten zu überprüfen

    f) Für die Einhaltung des Eignungskriteriums muss die Person im Referenzprojekt die Funktion Baustellenchef/in oder Stv. Baustellenchef/in ausgeübt haben

  4. EK4

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    VERFÜGBARKEIT DER SCHLÜSSELPERSON

    Evidence

    Bestätigung, dass die Mindestverfügbarkeit für die Schlüsselperson gemäss EK3 mindestens 80 % während der Zeit von Baubeginn bis Bauende beträgt.

  5. EK5

    TEXFY assessment: What this means: Subcontracting – how much of the work you may pass on to other companies.

    UNTERAKKORDANTEN

    Evidence

    Bestätigung, dass die Leistungen der Subunternehmer maximal 50 % der Angebotssumme (exkl. MwSt.) betragen.

Note of the contracting authority

Alle wirtschaftlich und technisch leistungsfähigen Firmen, die zudem dienachfolgenden Eignungsnachweise erbringen, sind aufgerufen, ein Angebot in CHF zu unterbreiten.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK1 QUALITÄT DES ANBIETERS

    10 %

    TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.

    Angabe und Erläuterung der folgenden Themen:

    - Organigramm der Baustelle inkl. Nennung Schlüsselperson sowie Projektleiter, Sicherheits- und QM-Beauftragter, Stellvertretende

    - Schlüsselperson: Baustellenchef/in (CV und Referenzprojekt): Für die Schlüsselperson ist ein Referenzprojekt und der Lebenslauf abzugeben. Für die Anforderungen an das Referenzprojekt gelten die Vorgaben gemäss EK3

  2. ZK2 QUALITÄT/PLAUSIBILITÄT DES ANGEBOTS

    20 %

    TEXFY assessment: What this means: Plausibility – whether the price and the service of your offer fit together convincingly.

    unterteilt in:

    ZK2.1 Bauprogramm; Gewichtung 10 %

    Angabe und Erläuterung der folgenden Themen:

    - Darstellung des Bauablaufs in einem Weg-Zeit-Bauprogramm

    - Aufzeigen des zeitkritischen Weges und der Einhaltung der Meilensteine

    - Erläuterung der bauzeitrelevanten Abläufe sowie massgebender Abhängigkeiten

    - Erläuterung der Schichtmodelle

    ZK2.2 Technischer Bericht; Gewichtung 10 %

    Angabe und Erläuterung der folgenden Themen:

    - Installationskonzept inkl. Angabe zur Ver- und Entsorgung der Baustelle und Abgabe des Installationsplans

    - Baustellenentwässerungskonzept nach SIA 431

    - Sicherheits- und Gesundheitsschutzkonzept, inkl. Rückbau asbesthaltiger Materialien

    - Erschliessungskonzept der einzelnen Teilbaustellen, Darlegung des Transportkorridors in der Tunnelröhre

    - Erläuterung der folgenden Themen unter Angabe der Leistungswerte im Bauprogramm:

    - Bauablauf des Rückbaus der Zuluftkanäle

    - Bauablauf des Abbruchs und Baus der Zwischendecke

    - Bauablauf des Abbruchs und Einbaus des Sohlgewölbes inkl. Werkleitungen

    - Bauablauf zur Instandsetzung des Kalottengewölbes inkl. Injektionen

    - Bauablauf des Rückbaus und Instandsetzung der Untertagzentrale QV.02 inkl. Kamin I und QV.06 inkl. Kamin III

    - Bauablauf der Sohlauffüllung inkl. Einbau aller Werkleitungen

  3. ZK3 PREIS

    70 %Price criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Bereinigte Angebotssumme.

Note of the contracting authority

Die Angaben betreffend Zuschlagskriterien müssen zusammen mit den (vorgegebenen) Angebotsunterlagen eingereicht werden.

PREISBEWERTUNG
Das tiefste bereinigte Angebot erhält die maximale Note (5). Angebote, deren Preis 30 % oder mehr über dem tiefsten Angebot liegen, erhalten die Note 0. Dazwischen erfolgt die Bewertung linear (auf 2 Stellen nach dem Komma gerundet). Allfällig offerierte Skonti werden bei der Bewertung des Preises nicht berücksichtigt.

BENOTUNG DER ÜBRIGEN ZUSCHLAGSKRITERIEN
Die Bewertung erfolgt immer mit Noten von 0 bis 5:

0 = Nicht beurteilbar; keine Angabe

1 = Sehr schlecht erfüllt; ungenügende, unvollständige Angaben

2 = Schlecht erfüllt; Angaben ohne ausreichenden Projektbezug

3 = Erfüllt, den Anforderungen der Ausschreibung entsprechend

4 = Gut erfüllt; Qualitativ gut

5 = Sehr gut erfüllt; Qualitativ ausgezeichnet, sehr grosser Beitrag zur Zielerreichung

Sofern ein Hauptkriterium aus Subkriterien besteht, werden diese benotet. Die Punktzahl des Hauptkriteriums ergibt sich aus der Summe der Noten der Subkriterien multipliziert mit ihrer Gewichtung.
Punkteberechnung: Summe aller Noten multipliziert mit ihrer Gewichtung(Maximalpunktzahl: Note 5 x 100 = 500 Punkte).

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

11 conditions
Bidding consortia
Allowed

Zugelassen.
Die Federführung muss einem Unternehmen der Bietergemeinschaft übertragen werden. Die weiteren Beteiligten sind in den Angebotsunterlagen bekannt zu geben. Mitglieder der Bietergemeinschaft dürfen nach Eingabe der Offerte nicht ausgewechselt werden.

Subcontractors
Allowed

Zugelassen.
Subunternehmer können zu max. 50 % beigezogen werden. Sie sind in den Angebotsunterlagen entsprechend aufzuführen.

Angaben betreffend Subunternehmern werden mitbewertet.

Die charakteristische Leistung ist grundsätzlich vom Auftragnehmer zu erbringen.

Contract extension
Possible
Dialogue
Not provided for
Securities and guarantees

Gemäss Ziffer 5 der vorgesehenen Vertragsurkunde.

Terms of payment

45 Tage nach Rechnungseingang im ASTRA bzw. der Bauherrenunterstützung.
Korrekte Rechnungsstellung mittels E-Rechnung vorausgesetzt.

Informationen der Bundesverwaltung zur E-Rechnung sind abrufbar unter:

http://www.e-rechnung.admin.ch/index.php.

Costs included in the bid price

Die Vergütung und die Preise umfassen sämtliche Leistungen, die in den Ausschreibungsunterlagen genannt und zur Vertragserfüllung notwendig sind.

Die Umlagerung von Einheitspreisen in Globalpositionen wie zum Beispiel die Baustelleneinrichtungen ist strikt verboten.
Der Unternehmer hat alle Positionen des Leistungsverzeichnisses auszufüllen; er schreibt „0“ bei allen Positionen, bei welchen er formell auf die Angabe eines Betrags sowie darauf verzichtet, später eine Vergütung für die betreffende Leistung zu verlangen. Ein solcher Eintrag muss im technischen Bericht begründet werden.

Die Aufsichts- und Führungskosten sowie die Kosten des Zeitaufwands für den Personaltransport dürfen nicht in den Baustelleneinrichtungskosten enthalten sein, sondern müssen gemäss Kalkulationsschema des SBV in den Einheitspreisen enthalten sein.

Gleichermassen müssen alle Endkostenzuschläge wie beispielsweise die technische und die kaufmännische Leitung, die Baustellenführung sowie die Finanzkosten im Kalkulationsschema des SBV in den entsprechenden Rubriken erfasst sein. Diese Kosten dürfen auf keinen Fall in den Baustelleneinrichtungen enthalten sein.

Terms and conditions

Gemäss vorgesehener Vertragsurkunde.

Other requirements

1. Vorbehalten bleiben die Beschaffungsreife des Projektes sowie die Verfügbarkeit der Kredite.
2. Die Erarbeitung der Angebote wird nicht vergütet. Die Angebotsunterlagen werden nicht zurückgegeben.

3. Ausschreibungsunterlagen sind in deutscher Sprache erhältlich. Bei Widersprüchen zwischen den Fassungen ist die deutsche Version massgebend.

Bidders from states outside the WTO agreement

Keine.

Conditions of participation

  1. Criterion 1

    Gemäss Ausführungen im Pflichtenheft.

Documents to submit

Only evidence that the publication itself names. This evidence belongs in the bid. The tender documents may ask for more.

5 pieces of evidence according to the publication
  • Suitability · EK1

    Eine vergleichbare Referenz: Bei der Beurteilung der Eignung wird eine Referenz als vergleichbar anerkannt, wenn sie mindestens folgende Bedingungen erfüllt:

    a) Art der Infrastruktur: Autobahn/Nationalstrasse, Kantonsstrasse

    b) Art des Werkes: Instandsetzung eines Tunnels mit einer Ausbruchbreite von mindestens 9 m und einer Länge von mindestens 500 m

    c) Vertragssumme des Referenzprojektes in der Höhe von mindestens CHF 25 Mio. exkl. MwSt

    d) Die Ausführung des Referenzprojektes muss abgeschlossen sein

    Im Fall einer Arbeitsgemeinschaft (ARGE) kann die Referenz auch von einem einzelnen ARGE-Mitglied sein

    Die von einer Firma oder von einem ARGE-Mitglied einer vorhergehenden ARGE dargelegte Referenz ist nur gültig, wenn die gleiche Firma bzw. das einzelne ARGE-Mitglied die in der Ausschreibung verlangten Arbeiten tatsächlich ausgeführt hat.

  • Suitability · EK2

    Bestätigung, dass der Jahresumsatz des Anbieters für die Jahre 2024 und 2025 mehr als das doppelte des Jahresumsatzes der Angebotssumme (exkl. MwSt.) beträgt.

    Nach Offerteingabe auf Verlangen des Auftraggebers einzureichende Eignungsnachweise/Bestätigungen, allesamt nicht älter als 3 Monate:

    - Handelsregister- und Betreibungsregisterauszug

    - Auszug Ausgleichskasse AHV/IV/EO/ALV

    - Bestätigung UVG-Versicherer

    - Bestätigung Steuerverwaltung

    - Versicherungsnachweise

  • Suitability · EK3

    Eine vergleichbare Referenz der Schlüsselperson: Als Schlüsselperson gilt die Funktion Baustellenchef/in.

    Bei der Beurteilung der Eignung wird eine Referenz als vergleichbar anerkannt, wenn sie mindestens folgende Bedingungen erfüllt:

    a) Art der Infrastruktur: Autobahn/Nationalstrasse, Kantonsstrasse

    b) Art des Werkes: Instandsetzung eines Tunnels mit einer Ausbruchbreite von mindestens 9 m und einer Länge von mindestens 500 m

    c) Vertragssumme des Referenzprojektes in der Höhe von mindestens CHF 25 Mio. exkl. MwSt

    d) Die Ausführung des Referenzprojektes muss abgeschlossen sein

    e) Die Schlüsselperson hat Deutsch als Muttersprache respektive mind. B2 als Sprachkompetenz gemäss gemeinsamem europäischen Referenzrahmen für Sprachen (CEFR) nachzuweisen. Der Bauherr behält sich vor, die sprachlichen Kompetenzen der Kandidaten zu überprüfen

    f) Für die Einhaltung des Eignungskriteriums muss die Person im Referenzprojekt die Funktion Baustellenchef/in oder Stv. Baustellenchef/in ausgeübt haben

  • Suitability · EK4

    Bestätigung, dass die Mindestverfügbarkeit für die Schlüsselperson gemäss EK3 mindestens 80 % während der Zeit von Baubeginn bis Bauende beträgt.

  • Suitability · EK5

    Bestätigung, dass die Leistungen der Subunternehmer maximal 50 % der Angebotssumme (exkl. MwSt.) betragen.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
17173
Publication number
17173-03
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Verfügung kann gemäss Art. 56 Abs. 1 des Bundesgesetzes über das öffentliche Beschaffungswesen (BöB) innert 20 Tagen seit Eröffnung schriftlich Beschwerde beim Bundesverwaltungsgericht, Postfach, 9023 St. Gallen, erhoben werden. Die Beschwerde ist im Doppel einzureichen und hat die Begehren, deren Begründung mit Angabe der Beweismittel sowie die Unterschrift der beschwerdeführenden Person oder ihrer Vertretung zu enthalten. Eine Kopie der vorliegenden Verfügung und vorhandene Beweismittel sind beizulegen.
Die Bestimmungen des Verwaltungsverfahrensgesetzes (VwVG) über den Fristenstillstand finden gemäss Art. 56 Abs. 2 BöB keine Anwendung.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.