Das vorteilhafteste Angebot erhält den Zuschlag, gestützt auf die Bewertung der Zuschlagskriterien und der daraus resultierenden höchsten Punktzahl.
- Construction and installation
- BKP 463 Pavement, trackbed, track and the like
- BKP 464 Drainage
- +1
Allschwil – Grabenring Erneuerung Fahrbahn inkl. Zusatzarbeiten / Tiefbauarbeiten
- Location
- Canton BL
- Requesting office
- Tiefbauamt, Bau- und Umweltschutzdirektion Kanton Basel-Landschaft
Awarded
Awarded to
- Tozzo AG BL, BubendorfCHF 733’176.00
What is being procured?
Scope of work
Hauptmengen:
- Belag aufbrechen / fräsen ca. 6’000 m2
- Aushubarbeiten ca. 600 m3
- Kiesgemisch ca. 600m3
- Anpassung Randabschlüsse ca. 500 m
- Belag Trag- und Binderschicht ca. 1'700 t
- Belag Deckschicht ca. 400 t
- Strassensammler neu ca. 25 Stk.
- Werkleitungsarbeiten ca. 150m
Nebenarbeiten:
- Verkehrsdienst ca. 1'700 Std.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 463 – Pavement, trackbed, track and the like
- BKP 464 – Drainage
- BKP 465 – Utility mains and sewers
- OAG 2 – Transport facilities
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- CPV 45233000 – Construction, foundation and surface works for highways, roads
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 9158
- Publication number
- 9158-02