- Construction and installation
Pfungen, Buckstrasse - Road rehabilitation with utility lines
- Procuring office
- F+H Partner AG
- Requesting office
- Gemeinde Pfungen
At a glance
- 18.12.2026, 15:0022 days left
- Not stated
- PfungenCanton ZH
- Open procedure
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in German.
Online via simap onlyGood to know
Bids are submitted on simap.ch; you need a bidder account there.
What is being procured?
Scope of work
Im Sinne der Werterhaltung ist die Sanierung der Buckstrasse im Innerortsabschnitt vorgesehen. Im Zuge dieser strassenbaulichen Massnahme wird die öffentliche Beleuchtung normgerecht sowie entsprechend den aktuellen Standards angepasst. Die Infrastrukturen der Gas- und Wasserversorgung wurden bereits erneuert; diesbezügliche Sanierungsmassnahmen sind nicht erforderlich. Das bestehende Konzept der Abwasser- und Entwässerungsanlagen bleibt grundsätzlich unverändert. Gemäss den Vorgaben im Rahmen der GEP-Erarbeitung wird im unteren und mittleren Abschnitt auf einer Länge von rund 250m die Mischabwasserleitung ersetzt. In diesem Zusammenhang erfolgen Kalibererweiterungen zur Behebung hydraulischer Überlastungen. Die Anlagen der Strassenentwässerung werden neu erstellt, während die in der Fahrbahn und im Gehweg längs verlaufende Sickerleitung bestehen bleibt.
Mit der Einführung einer Tempo-30 Zone wird der Strassenraum verkehrsberuhigt umgestaltet und an das neue Temporegime angepasst. Die hierfür vorgesehenen baulichen Massnahmen wurden im Verfahren nach Strassengesetz (StrG) aufgelegt, rechtskräftig festgesetzt und sind Bestandteil des vorliegenden Strassenprojekts.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not provided for
- Variants
- Admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 26.11.2026
- Documents available
- 26.11.2026 to 18.12.2026
- Questions untilnext
- 07.12.2026
Fragen ausschliesslich per Mail an sturzenegger@fh-ing.ch
- Submission deadline
- 18.12.2026, 15:00
- Bid valid
- until 17.03.2027
- Execution
- 15.03.2027 to 31.12.2027
Submission & documents
Online via simap.ch
Source: simap data
- Documents on simap.ch (after signing in)
- German
- German
- Free of charge
- Through an external system as stated in the tender.
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Documents to submit.
Participation & suitability
gemäss Ausschreibungsunterlagen
Award criteria
gemäss Ausschreibungsunterlagen
Conditions
4 conditions
- Bidding consortia
- Allowed
- Subcontractors
- Not given
- Contract extension
- Possible
- Dialogue
- Not provided for
Official source
- simap project number
- 48278
- Publication number
- 48278-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
Gegen diese Ausschreibung kann innert 20 Tagen, von der Publikation an gerechnet, beim Verwaltungsgericht des Kantons Zürich, Freischützgasse 1, Postfach, 8090 Zürich, schriftlich Beschwerde eingereicht werden. Die Beschwerdeschrift ist im Doppel einzureichen. Sie muss einen Antrag und dessen Begründung enthalten. Die angefochtene Ausschreibung ist beizulegen. Die angerufenen Beweismittel sind genau zu bezeichnen und, soweit möglich, beizulegen.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.